Bišumuiža is one of the neighbourhoods where connections to the phase 4 Cohesion Fund water services networks have been supported since 2018. So many jobs here are about how to join a house's drains and water supply to the city network and what happens with the yard drain and the cellar.
Connecting to the phase 4 network step by step
The connection process as a whole includes technical conditions, a design, approvals, construction and handover, and it usually takes about 4–6 months, in some cases longer. The plumber is only one part of it; the sequence is usually as follows.
- Check the address on vaitevtovajag.lv you can find out whether the service pipe has been built up to your plot.
- Technical conditions and design the process starts with them; work in the city system may only be done under the supervision of a water supply and sewerage construction supervisor who has the rights needed for this work.
- Service pipe on the plot the pipe from the house to the inspection chamber or chamber at the plot boundary is the owner's part, built according to the design.
- Work inside the house the internal drains and water supply have to be prepared for the new connection: the outlet from the house, the falls, the cleanout points.
- Contract and handover after construction a contract is signed with Rīgas ūdens; co-financing is paid out after construction.
Riga City Council binding regulations No. 17, clauses 3 and 75; LV portāls on co-financing conditions and the duration of the connection. Checked 16.11.2026.
Co-financing by service pipe length
Riga City Council regulations RD-23-207-sn provide co-financing for connecting a residential house to the centralised sewerage by service pipe length. It is paid out after construction, if at least one person is declared as resident at the property and a contract has been signed with Rīgas ūdens. No co-financing is provided for a water supply connection.
| Sewer service pipe length | Co-financing |
|---|---|
| up to 5 m | €1,000 |
| 5–20 m | €1,500 |
| over 20 m | €2,000 |
If the connection requires work within the street's red lines, Rīgas ūdens offers additional support of up to €12,000 for building the sewer service pipe. Ask Rīgas ūdens for the exact conditions for your address, as they can change.
RD-23-207-sn (likumi.lv); LV portāls releases on the phase 4 neighbourhoods and the Rīgas ūdens campaign. Checked 16.11.2026.
A cellar in the Daugava valley and by the Bišumuiža ditch
In the northern part of the neighbourhood, in the Daugava valley, there is loose sand with silt layers from 1–3 m to 6–8 m thick, and the groundwater is shallower than 1.5 m. In built-up places the ground has been replaced with several metres of fill. Around the Bišumuiža ditch, which crosses the neighbourhood, the groundwater level is also high. In the Ziepniekkalns dune part, though, the groundwater is deeper than 1.5 m and the building conditions are fairly favourable.
If a house has a cellar with a sink, shower, washing machine or drain, before connecting to the city network it has to be measured whether these fixtures are lower than the cover of the nearest sewer inspection chamber. If they are, Riga's regulations require a non-return valve or an electrically operated gate valve. Drainage or rainwater may not be discharged into the domestic drains without approval, so a cellar pump is not connected to the new pipe just because it is convenient.
Valve requirement and groundwater ban: regulations No. 17, clauses 63.8 and 63.9, viewed on likumi.lv on 16.11.2026.
Your own well and the city water supply in one house
If the house has so far had its own borehole or well and the city water supply is now being connected, the two systems have to be separated. Riga's regulations forbid connecting a borehole system to the city water supply. If you keep the borehole, for example for the garden, it must be a completely separate pipe with its own taps.
In the house, the old pressure booster pump or pump line has to be disconnected from the internal pipe and checked so that no link between the two systems has been left anywhere.
Separating the borehole and the city water supply is required by regulations No. 17, clause 63.6 (likumi.lv, checked 16.11.2026).
Starting prices for yard drain and internal work
| Job | Price | What it includes |
|---|---|---|
| Yard drain cleaning | from €50 | first hour, a blockage between the house and the chamber |
| High-pressure pipe jetting | from €60 | first hour, minimum 1 h |
| One new or replaced outlet | from €35 | a water or drain outlet up to the fixture |
| A new or replaced pipe in the house | from €10/m | fitting along a wall or floor with fixings |
Everywhere the price is for labour; materials are extra; chasing and restoring the finish are not included. If there is a travel charge for Bišumuiža, you are told on the call before the work starts. Building the external service pipe according to the design is ordered separately, and its price depends on the design.
Services for Bišumuiža private houses
For house and yard pipes: drain cleaning in Bišumuiža and waste pipe replacement. For the water supply after switching over: pipe repair and installation. For your own boiler and radiators: heating system repair in a private house. For heating water: water heater installation.
Between Bauskas iela and Ķekava municipality
The main streets are Bauskas iela and Ziepniekkalna iela, and access has improved with the building of the Southern Bridge and its connections. Bišumuiža borders Katlakalns, Ziepniekkalns and Ķekava municipality, and the Salas only across the water; we have no pages for these places on this site. The same phase 4 programme also applies to Bieriņi and Bolderāja, and the Āgenskalns page has an overview of houses in Pārdaugava, Riga's left bank. All neighbourhoods: plumber in Pārdaugava.
Sources
- Bišumuiža area 224.3 ha, 2,653 residents (2025) checked 16 November 2026
- Residential and detached-house areas 29%, mixed development about 17% by Bauskas iela and Ceraukstes iela checked 16 November 2026
- Bišumuiža is a phase 4 neighbourhood since 2018; co-financing up to €2,000 checked 16 November 2026
- The connection process usually takes 4–6 months; no co-financing for water supply checked 16 November 2026
- Co-financing by service pipe length €1,000/1,500/2,000 and payout conditions checked 16 November 2026
- Additional support up to €12,000 within the red lines; vaitevtovajag.lv checked 16 November 2026
- Silt in the Daugava valley, groundwater shallower than 1.5 m; the Bišumuiža ditch; the Ziepniekkalns dune part checked 16 November 2026
- Main streets Bauskas iela and Ziepniekkalna iela; the Southern Bridge checked 16 November 2026
- Regulations No. 17, clauses 3, 63.6, 63.8, 63.9 and 75 checked 16 November 2026